Steel Mill Use Double Girder Overhead Crane Bridge Crane Clamp Crane

Steel Mill Use Double Girder Overhead Crane Bridge Crane Clamp Crane

The Steel Mill Clamp Crane is composed of main beam, end carriage, electric hoist(or you can choose chain block), electric power transmission device and operation room(as your demand).

Send InquiryChat Now
Product Details

The Steel Mill Clamp Crane is composed of main beam, end carriage, electric hoist(or you can choose chain block), electric power transmission device and operation room(as your demand). 

RE the control,There are three control method,Pendent line(included); Wireless remote control,Operation room and the operational room which has open model and closed model and can be installed on left or right side according to the practical situation. And the direction of entering has two ways, sideway enterance and end surface enterance, in order to satisfy the users' choice in different conditions.

The Steel Mill Clamp Crane is good choice especially for lift and transport different slabs with different clamps basing on the standard and weight of materials (thickness, length and the stack). Also we can provide speed regulation (1:10 or more) for each mechanism and the overload alarm, remote control, PLC control, malfunction detection and display system.

safety device of the Steel Mill Clamp Crane.

The Steel Mill Clamp Crane 

To guarantee the normal operation of crane and avoid the personal casualty and mechanical damage, the safety device we provide are not only the electric  protective devices or alarm bell but also other equipments as follows

1.Weight overload protection device. 

2.Top quality long time bearing polyurethane materials buffer.

3.Crane travelling limit switch.

4. Voltage lower protection function.

5. Emergency stop system.

6.Current overload protection system

Feature

1. When hoisting vertical coil, two pairs of inner and outer tong legs move separately; inner legs support the inner wall of steel coil outward while outer legs tong the external wall of the coil inward so as to produce clamping force.

2. After vertical coil is hoisted, the bottom of the coil is absolutely horizontal.

3. In operation, there is no relative sliding between the tong and the coil, which makes no damage on steel coil.

4. The jaw of this tong imposes a clamping force that is half of that of single-arm tong on the coil. 

Gru-a-ponte-02_副本.jpg

jarsaghil-saghfi_副本.jpg

Hot Tags: steel mill use double girder overhead crane bridge crane clamp crane, customized, manufacturers, warehouse
Related Products
Inquiry

Copyright © Henan Armagh Machine Equipment Co.,Ltd All Rights Reserved.