10 Ton Remote Control Overhead Cranes

10 Ton Remote Control Overhead Cranes

Double-girder bridge cranes mainly consist of bridges, carts, trolleys, and electrical equipment. According to the use of different degrees, divided into A5, A6, A7 three levels of work. Hook bridge crane maneuvers are all completed within the driver. Installation specifications

Send InquiryChat Now
Product Details

10 ton remote control overhead cranes

Double-girder bridge cranes mainly consist of bridges, carts, trolleys, and electrical equipment. According to the use of different degrees, divided into A5, A6, A7 three levels of work. Hook bridge crane maneuvers are all completed within the driver. Installation specifications

The trolleys were inspected and passed the test at the factory. Therefore, after a slight adjustment to eliminate the transport deformation, it can be installed directly on the bridge. In the case where the bridge installation meets the relevant technical conditions, the trolley must not have three legs (ie, only three trolley wheels are in contact with the track, and the other is suspended. ), otherwise, under the suspension of the bearing under the wheel or under the track pad adjustment, the pad can only be a layer, under the rail must be placed under the main beam ribs, both ends of the spot welding fixed.

1 The metal structure of the test indicators in accordance with regulations, in order to reduce the amount of high-altitude operations, the installation of equipment, wiring, etc. as far as possible on the ground.

2 Before erecting the crane, it must be pre-installed according to the following method. If defects are found and eliminated in time, if the user cannot handle it, contact the manufacturer immediately. When the crane is erected on the factory, the manufacturer cannot handle such problems.

a. Place the crane on two parallel and several planes in the same plane.

b. Use the bolt holes of the end beam as the positioning accuracy. Connect the end beams in accordance with the attached diagram—crane installation and connection site markings. Combine the cranes. Tighten the bolts after adjustment. After the crane is assembled, all indicators should meet the relevant data.

333.png

3.5.jpg


Hot Tags: 10 ton remote control overhead cranes,
Related Products
Inquiry

Copyright © Henan Armagh Machine Equipment Co.,Ltd All Rights Reserved.